A floor buffer is a fast moving high powered machine.
Concrete floor flaking.
You can rent a floor buffer from a hardware supply store.
Lack of preparation before painting.
Temperature changes heavy weights and dropped objects can all damage your concrete floor by causing cracks and holes.
Spalling or concrete surface failure on a garage floor is caused by residual water in the concrete expanding and contracting during freeze thaw cycles.
A moist surface isn t ideal for further cleaning or painting.
Poor adhesion which often occurs if hardeners are added to concrete.
Is your pitted flaking driveway bringing you and your home s curb appeal down.
Concrete paint can be purchased in either latex or oil based epoxy enamel.
A section is an area about 10 x 12 ft.
Fortunately patching damaged concrete is an easy.
Here s an easy fix that will have your concrete surface smooth again in practically no time.
Doing the prep work before you repaint a concrete floor avoids a peeling paint job later.
Use a floor buffer for scuffing away the loosened spots of paint.
Peeling on concrete floors occurs when paint adhesion is lost and the loose paint starts peeling off in single or multiple coats.
Allow the cleaned surface to dry.
While concrete is a strong construction material it can still crack.
Step 2 buff the concrete surface.
If a thin layer of the surface of the concrete slab is peeling it can be a result of two common installation errors.
Grease oil wax and dirt tend to soak in and are difficult to remove from concrete.
Adding water weakens the surface of the concrete and diminishes its strength and durability.
How to repaint concrete floors.
1 when the concrete sets faster than the finisher can complete his job additional water is added to the surface to extend the working tim e.
Resurfacing your driveway patio or basement floor with a 1 2 in.
A loss of adhesion a paint coating from concrete flooring resulting in flaking and peeling of the paint coating.
Enlist a couple of helpers and overlay the concrete surface one section at a time.
The initial signs of surface flaking usually.
Failure to acid etch a smooth concrete floor before painting.