Use a self leveler on low spots and or sand high spots of wood or concrete.
Concrete floor prep for linoleum.
If your concrete subfloor was just poured you ll need to allow it to properly cure for a minimum of 60 days before your luxury vinyl flooring installation begins.
If you have a vinyl floor you may be able to install your flooring directly on top of it.
Leave the vinyl in place for 72 hours.
Prep your subfloor so that it s clean dry and level within 3 16 inch change per 10 feet.
Tape a 3 foot square piece of scrap vinyl to the concrete with duct tape sealing the edges tight.
Also it is important to take time and prepare well before you start assembling.
With the right preparation and adhesive learning how to install vinyl flooring can be installed over almost any clean dry surface.
Self leveler is available in powder and pre mixed form and is used to create a flat smooth surface in flooring projects.
Sand the entire surface of your floor to prepare the surface of the concrete.
Multiply length times width of the room.
Remove any carpet or other flooring.
Use concrete filler or a similar floor patching compound to repair the damage.
Piece of vinyl flooring and taping the edges.
The steps in this guide on how to install vinyl plank flooring on concrete are quite easy to follow.
It has to be level and even though vinyl is waterproof a floating floor always benefits from a moisture barrier.
Determine how much flooring and materials will be needed.
Inspect the floor and repair cracks pits holes or other uneven patches.
It all starts with careful floor prep.
This ensures the adhesives you use for your linoleum will bond with the concrete.
Vacuum any concrete dust from the floor.
Preparing a concrete subfloor for luxury vinyl flooring concrete is a common subfloor material and in general it s easy to prepare for a luxury vinyl flooring installation project.
Test the floor for moisture.
Don t sand vinyl flooring as it may contain asbestos.
If you plan to install it over concrete check for excess moisture by gluing down a 3 x 3 ft.
After 72 hours try to pull up the.
Prepare the subfloor repair cracks and holes.
Add about 10 to that number to account for any possible mistakes and warped boards.
However laying vinyl flooring over concrete requires a bit more preparation.
If you don t have all the tools or you want to be 100 sure you don t waste any material invite a friend over to help you.