Total height of low level ground level deck.
Concrete footing size for 6x6 post.
Form tubes make it easy to pour concrete support footings for mailboxes fence posts decks and other structures.
A 6 x 6 might overlap an 8 tube so go to 10.
Set custom price range.
40 50 4 50 100 8 100 150 1 150 200 1 savings center.
An 8 tube should be fine if you use 4 x4 posts.
Nominal post size in.
Apr 28 20 11 17 am.
The calculator will give you the results in cubic yards and number of pre mixed bags of concrete 40 lb 60 lb and 80 lb bags.
Simpson strong tie mpbz zmax galvanized moment post base for 6x6 nominal.
I just want to put up two 6x6 posts with titan wood post anchors either 35 or 70 apart read more.
Bulk pricing 2 your selection.
Wood to concrete 17 wood to wood 13 price.
When using wood posts get foundation grade 6x6 treated poles or posts.
Use the post hole estimator to quickly find out how much concrete you will need to set your fence posts.
After digging a hole in the correct dimensions for the support slide the form tube into the hole and fill it with concrete making sure the concrete mix is properly consolidated to eliminate air pockets and other defects.
When using a gravel footing nail a square of pressure treated 2x10 or 2x12 to the bottom to act as a foot.
4 x 4 posts are fine for a 10 x 12 deck.
Wood post foundation piers.
Anyone that fails to tell you to.
The 6x6 post is the minimum recommended size in order to provide the strength rigidity and the proportion in the final appearance.
First draw a line dividing the deck into two halves between the house and the footings.
Enter your post and hole dimensions in any units.
I am building a 10 x12 deck not attached to a ledger board.
For example if you are building a 10x10 deck attached to a house with two footings on the corners you could calculate the loads for the footings in the following way.
Pergola post installation mounted on concrete footer or existing slab.
The post saddles for the deck foot anchor have a lateral slide feature which allows the saddle to be moved up to about 2 to make up for any errors in the location of your pergola footings.
My plan was to pour concrete footings then run doubled up 2x8 beams setting on the footings.
Order the 8 foot or 10 foot post option and add the post attachment hardware to your order.